Menu Close

What does a Floorhand do on a workover rig?

What does a Floorhand do on a workover rig?

A floor hand is a member of the crew on an oil rig. They are responsible for assisting other crew members in setting up and cleaning up each day. Floor hands perform a variety of manual labor tasks and work closely with roustabouts, derrick hands, crew pusher and equipment operators on rigs offshore or onshore.

What is a workover rig operator?

The job of the Workover Rig Operator is to safely and efficiently operate all rig components while overseeing a crew of 1-2 Floorhands. The Workover Rig Operator reports directly to the Rig Supervisor. Responsibilities include: Perform services on oil and gas wells as part of a 3-5 person workover rig crew.

What is a workover crew?

Workover crews are called when an oil well has been drilled, is undergoing repair or is being retired, as indicated by Schlumberger. These crews are relatively small compared to other rig crews and consist of tool pushers, operators or relief operators, derrick men and floormen or roughnecks.

Is a Floorhand a hard job?

One who obeys instructions and performs manual labor to a high standard can thrive in this role. As this work is tough, floorhands need the stamina to be able to withstand the rigors of life on an oil rig. This can mean working many days in a row without a break in a cold, harsh environment.

What is oilfield workover?

The process of performing major maintenance or remedial treatments on an oil or gas well. In many cases, workover implies the removal and replacement of the production tubing string after the well has been killed and a workover rig has been placed on location.

How do I become a Floorhand?

To become an oilfield floorhand, you need a high school diploma or GED certificate, a valid driver’s license, and a reliable mode of transportation. Post-secondary education is not required, though some complete a certificate program in a mechanical field to gain experience with industry tools.

How long is a workover rig?

Workover rigs have a surface depth that is equipped with diesel engines and transmissions and is available from 8000 ft to 30000 ft. Workover rigs contain a full line of drilling packages.

How long is Floorhand training?

5 days
Floorhand Training is an Entry Level oilfield awareness course. Classes are 10 hours a day for 5 days. Our instructors are recruited from the industry and ensure quality education with extensive knowledge of the oil and gas industry and current safety standards.